- About Redhorse
- Services
- Projects
- Advanced Metering Infrastructure and SmartGrid
- Air Quality
- Big Pine Paiute Tribe - Emissions Inventory Update & Air Quality Assessment
- Century Aluminum - Permitting Support
- Confidential Utility Client - Air Quality & Meteorological Monitoring
- Confidential Utility Client - Permitting Support
- Denison Mines (USA) Corp. - Environmental Compliance & Permitting Support
- Hawthorne Army Depot - Class I Air Permit Modifications and Compliance Support
- Hawthorne Army Depot - Human Health and Ecological Risk Assessment
- Climate Change
- ADESA Climate Change Regulatory Analysis
- Community-Wide GHG Emissions Inventory for the Gila River Indian Community
- Denison Mines, Air Modeling and Impact Analysis
- Limited Analysis of the Federal Climate Change Market for Det Norske Veritas Certification, Inc.
- NV Energy Emission Inventory Preparation and Reporting
- Energy Management
- Air Force Base-Wide Energy Audits
- Federal Aviation Administration Control Tower and Support Buildings Energy Audits
- Federal Aviation Administration Control Tower Design Review
- General Services Administration Great Lakes Region – Detailed (Level II) Energy and Water Audits
- Gila River Indian Community, Energy Efficiency and Conservation Block Grant, Energy Audit Training and Capacity Building
- High Desert Generation, Boiler System Fuel-to-Steam Efficiency
- Pacific Northwest National Laboratory – Technical Assistance and Support Services
- Resource Efficiency Management services to the U.S. Coast Guard, U.S Army – Pacific Region
- U.S. Army Advanced Metering Program in Alaska
- U.S. Coast Guard, Air Station Clearwater, Energy Audit
- U.S. Customs and Border Protection Data Center and Laboratory Energy Audits
- Information Technology
- Communication System Design, Integration, and Installation
- Communications System Site Surveys
- Department of Homeland Security, Interoperable Communications Technical Assistance
- Naval Facilities Engineering Command, Advanced Metering Infrastructure Communications and Engineering Support
- Project Management for Radio System Expansion
- Radio System Frequency Coordination
- SmartGrid Communications Systems Site Surveys
- SmartGrid Communications Systems Test Management Services
- Litigation Support
- Permitting
- Renewable Energy
- Biogas Cogeneration and Effluent Reuse at the Schofield Barracks Wastewater Treatment Plant
- Electric Utility, Renewable Energy Powered Communication Units
- Electrical and Controls Engineering, Logic and Software Support for a Prototype Pyrolysis System
- Fort Richardson Landfill Gas Cogeneration Project
- National Marine Fisheries Services, Solar Outdoor Lighting
- Power Purchase Agreement Support, Private Client
- Preliminary Siting and Design Criteria for a Natural Gas-Fired Generating Facility, Private Developer
- Renewable Energy Stakeholder Outreach Support, Private Solar Developer
- U.S. Army Corps of Engineers, Los Angeles District, Fort Irwin Renewable Energy Assessment
- Vehicles
- Small Business Administration 8(a) Business Development Program
- California Multiple Award Schedule (CMAS)
- GSA Facilities Maintenance & Management (03 FAC) C03FAC
- GSA Information Technology Services (IT) C070
- GSA Environmental Services (ES) Schedule (C899)
- GSA Mission Oriented Business Integrated Services (MOBIS) C874
- GSA Professional Engineering Services (PES) C871
- Navy SeaPort-e
- Clients
- Careers
- News
- Contact Us
Air Force Base-Wide Energy Audits

Redhorse provided engineering, project development, and economic analysis for base-wide energy audits at Ramstein Air Base, Royal Air Force (RAF) Croughton, and Aviano Air Base. The base-wide audits included more than 400 buildings and 7.3 million square feet of facilities, including office, commercial, residential, warehouse, recreational, medical, hangar, and maintenance buildings. Detailed energy audits were conducted at each installation to identify energy saving processes, procedures, and energy projects for subsequent project prioritization and programming. Auditing included planning, baselining energy consumption, site inspection, data evaluation and analysis, energy modeling, and development of energy conservation measures. Redhorse also conducted life-cycle cost analysis and calculated savings to investment ratios for programming and future implementation by the Air Force for energy conservation measures with a capital cost of more than $100,000.