- About Redhorse
- Services
- Projects
- Air Quality
- Big Pine Paiute Tribe - Emissions Inventory Update & Air Quality Assessment
- Century Aluminum - Permitting Support
- Confidential Utility Client - Air Quality & Meteorological Monitoring
- Confidential Utility Client - Permitting Support
- Denison Mines (USA) Corp. - Environmental Compliance & Permitting Support
- Hawthorne Army Depot - Class I Air Permit Modifications and Compliance Support
- Hawthorne Army Depot - Human Health and Ecological Risk Assessment
- Climate Change
- Community-Wide GHG Emissions Inventory for the Gila River Indian Community
- Limited Analysis of the Federal Climate Change Market for Det Norske Veritas Certification, Inc.
- ADESA Climate Change Regulatory Analysis
- NV Energy Emission Inventory Preparation and Reporting
- Denison Mines, Air Modeling and Impact Analysis
- Advanced Metering Infrastructure and SmartGrid
- Utility Communications Infrastructure Assessment
- Electric Utility Development and Installation of Radio Sites
- Department of Homeland Security, Interoperable Communications Technical Assistance
- Defining the Pathway to the California Smart Grid of 2020 for Publicly Owned Utilities
- Naval Facilities Engineering Command, Advanced Metering Infrastructure Communications and Engineering Support
- Energy Management
- Air Force Base-Wide Energy Audits
- Pacific Northwest National Laboratory – Technical Assistance and Support Services
- General Services Administration Great Lakes Region – Detailed (Level II) Energy and Water Audits
- Federal Aviation Administration Control Tower and Support Buildings Energy Audits
- Federal Aviation Administration Control Tower Design Review
- Gila River Indian Community, Energy Efficiency and Conservation Block Grant, Energy Audit Training and Capacity Building
- U.S. Customs and Border Protection Data Center and Laboratory Energy Audits
- U.S. Coast Guard, Air Station Clearwater, Energy Audit
- High Desert Generation, Boiler System Fuel-to-Steam Efficiency
- U.S. Army Advanced Metering Program in Alaska
- Resource Efficiency Management services to the U.S. Coast Guard, U.S Army – Pacific Region
- Litigation Support
- Permitting
- Renewable Energy
- Biogas Cogeneration and Effluent Reuse at the Schofield Barracks Wastewater Treatment Plant
- Fort Richardson Landfill Gas Cogeneration Project
- U.S. Army Corps of Engineers, Los Angeles District, Fort Irwin Renewable Energy Assessment
- Electric Utility, Renewable Energy Powered Communication Units
- National Marine Fisheries Services, Solar Outdoor Lighting
- Power Purchase Agreement Support, Private Client
- Renewable Energy Stakeholder Outreach Support, Private Solar Developer
- Preliminary Siting and Design Criteria for a Natural Gas-Fired Generating Facility, Private Developer
- Electrical and Controls Engineering, Logic and Software Support for a Prototype Pyrolysis System
- Air Quality
- Vehicles
- Clients
- Careers
- News
- Contact Us
Development and Installation of Radio Sites
Redhorse is developing and installing six radio sites along the transmission tower path for a new high voltage power line project. The project is one of the first new transmission investments intended to access renewable energy from the southeastern portion of California. The transmission line will cover more than 120 miles from San Diego to the Sonoran Desert and will pass through remote and environmentally sensitive regions. Redhorse is providing a complete power solution to support the communication infrastructure needs of the project. Our support includes design, development, and deployment of a self-contained renewable energy generation system, power storage, and power conditioning equipment to meet the remote and environmentally sensitive requirements of the project. The self-contained system is being deployed in a modified shipping container with a fold-out photovoltaic array, wind turbine, and communication tower. The power storage, power conditioning, communications equipment, and HVAC system are included in the shipping container. The containers and all enclosures inside the containers are rated for protected outside use and are equipped with alarm sensing contacts and serial data inputs to the utility-supplied Motorola Supervisory Control and Data Acquisition (MOSCAD) system.